50kva Voltage Transformer - Factory, Suppliers, Manufacturers

Our target is to consolidate and improve the quality and service of existing products, meanwhile constantly develop new products to meet different customers' demands for 24kv Switchgear,3 Phase Transformer,3000kva Transformer.We sincerely welcome you come to visit us. Hope we have good cooperation in the future. The product will supply to all over the world, such as Europe, America, Australia, Turkey ,Iran ,Algeria ,Really should any of these items be of interest to you, please let us know. We will be pleased to give you a quotation upon receipt of one's detailed specifications. We've our personal specialist R&D enginners to meet any of the requriements, We look forward to receiving your enquires soon and hope to have the chance to work together with you inside the future. Welcome to take a look at our organization.
  • Easy Ways To Bring Shaker Style To Your Bathroom

    The Shaker style of architecture and craftsmanship was developed by the Shakers, who arrived in North America in the late 1700s. They followed a set of rules called The Millennial Laws, which di

  • ParlorUs.com Launches Custom-Made Luxury Dining Chairs and Allows Customer's Own Materials - Furniture Today

    This press release is submitted and shown here in its original form, unedited by Furniture Today.

    LINDEN, N.J., Oct. 26, 2022 (GLOBE NEWSWIRE) — ParlorUs.com, a new brand of UE Seating,

  • TCN Takes Delivery of 15 New Power Transformers Under World Bank Funding – TechEconomy.ng

    The transformers comprise ten (10) number 60MVA 132/33kV and five (5) number 150MVA 330/132kV capacity transformers delivered to TCN Central Store in Ojo, Lagos State, for onward delivery to var

  • Can Liv-Connected crack the modular housing code?

    Liv-Connected, a modular construction company, is hard at work trying to solve the country’s housing crisis. Their solution? A customizable, prefabricated home that can be assembled on-site in

  • ;
  • Tangedco must bear the cost of installing of distribution transformer, rules TNERC - The Hindu

    The Tamil Nadu Electricity Regulatory Commission also said excess charges collected should be refunded in 30 days or adjusted in future bills. Credit: File Photo   | Photo Credit: JAMES S

  • GE-BOND consortium awarded landmark contract to build high-voltage electrical systems for Empire Offshore Wind 1 in New York | REVE News of the wind sector in Spain and in the world

    A specially formed consortium between GE Renewable Energy’s Grid Solutions and New York-based BOND Civil & Utility Construction today announced it has been awarded an EPC (Engineering, Pro

  • Manufacturer rises from the ashes, successfully tests 45MVA transformer

    SGB-SMIT POWER MATLA (SSPM) has achieved a Phoenix milestone event by successfully testing a 45MVA transformer in the newly-built test facility at the Pretoria Power factory.

    This marks th

  • News: Skilling startup Equip.co raised $400K in pre-seed funding — People Matters

    The Bengaluru-based skilling assessment platform Equip. co has secured a $400K pre-seed round. The cash injection would be provided by Better Capital. 

    Vaibhav Domkundwar, Better Capital,

  • ;