Bhopal (Madhya Pradesh): Madhya Pradesh Power Transmission Company has installed a specially designed 500 MVA capacity power transformer for the first time in the transmission network of Madhya Pradesh. The transformer manufactured at an estimated cost of Rs 25 crore was successfully installed
The progress already seen in the negotiations with Skypower Global of the United Arab Emirates to invest in 500 megawatt solar stations in Zimbabwe promises to keep the accelerated growth we are now seeing in our economy to continue after the Hwange Extension comes on line over the next few mo
Death/goregrind vets Exhumed have announced a new album, To The Dead, due October 21 via Relapse (pre-order). Frontman Matt Harvey says:
Like a lingering infection, we’ve returned to excruciate your eardrums and splatter your senses! The lads and I are very stoked to excrete our l
Noida-headquartered Srex Power India has recently secured an order worth Rs 660 million from Vivo Mobile India for building an EHV 220kV Gas Insulated substation.
Investing in Solutions that Drive Sustainable Future doesn't Necessarily Mean Higher Capex
Permanent link to this press release:
Delete press release Edit press rele
The US International Trade Commission has launched a new investigation into SolarEdge, following a lawsuit from power electronics specialist Ampt.
Ampt, a power electronics specialist based in Colorado, has filed a lawsuit against SolarEdge, a major player in the power electronics space,
August 18, 2022 11:04 ET | Source: Research Nester Research Nester
New York, New York, UNITED STATES
This new pole-mounted transformer on River Street in Easthampton was installed by Eversource after an old transformer containing PCBs crashed to the ground in an Oct. 24, 2107 rain storm. (Mary Serreze photo)
EASTHAMPTON -- A recent rainstorm brought down a wooden utility pole with an
Hitachi Energy and Energinet have been partnering since 2013, with the successful installation of 420-kilovolt (kV) compact gas-insulated switchgear (GIS) for Revsing substation. Energinet integrates large variable renewable energy while also maintaining a highly reliable and secure electrical
Jordan has completed a substation expansion that will allow it to increase electricity imports into Palestine.
Prime Minister Bishr Khasawneh and his Palestinian counterpart, Muhammad Shtayyeh, inaugurated a major upgrade project at the Ramah power station in the Jordan Valley on Wednes